opolisbas.blogg.se

Crackerbox race boats sale
Crackerbox race boats sale








crackerbox race boats sale

(2) 8' pcs of Trelleborg wet exhaust hose the shaft is not finished on ends, needs taper cut and cut to lengthĪn aluminum shaft log is installed as is the chrome stuffing box.Ī thrust ball bearing and mount is installed The wiring for these items is run.ĭrivetrain is chrome steel shaft with a fabricated steel high strength strut, 12 deg with cutlass bearing installed. The interior has indirect cockpit lighting, bow light, stern light and bilge pump are not installed nor included. The electrical system is completely wired, lighted switches for all systems.Īll circuits are fused and wiring is bundled and neatly installed. Seating and side panels are of polyfoam covered with marine vinyl, bases are epoxy coated marine ply. Gauges are Teleflex Amega, chrome bezels, back lighted, marine ignition switch with extra key Teleflex rack and pinion steering system, with mechanical linkage to the outboard rudderĪ hot foot throttle is installed, no cableĭashboard is solid red oak finished with multiple coats of spar varnish The fuel tank is located in rear, and 18 gallon aluminum tank with deck fill and vent system It is set up for a small block Chevy, mounting plates and bell housing is included The engine mount is a rail system made of aluminum alloy as are the stringer to engine bearer mounts. Note, the bottom and the deck are complete, the sides only have one coat of color, they need 2 more, material is supplied. The exterior was then primed with Pettit Easypoxy and finished with Easypoxy Urethane enamel. Sheeting - bottom is 1/2" fir marine ply, sides and deck are 1/4", all fastened with silicon bronze fastenersĪll wood was assembled with epoxy and interior is coated with 3 coats of epoxy and 3 coats of spar varnish.Īll exterior ( hull and deck ) are coated with epoxy and 7 OZ fiberglass cloth ( Cloth needs to be re-done around engine compartment), finished out with 3 additional coats of epoxy. I have too many projects and this one has to go.įramework and stringers - all #1 SYP very strong and straight grained, all frames glued and bolted together.

crackerbox race boats sale

(the engine in the pics is a plastic mock-up motor) It was completed in 2009 and hasnt been touched since. This boat was built from Glen-L plans over 3 years, it has never had a real engine installed.










Crackerbox race boats sale